| Status | Projects | Capacity | Share of total MW |
|---|---|---|---|
| Proposed | 700 | 88.5 GW | 34.5% |
| Under construction | 260 | 70.8 GW | 27.6% |
| Operational |
Every project bucketed by the party of the state's currently sitting governor. Reflects 2025 results: NJ (Sherrill) and VA (Spanberger) flipped to D in November, both sworn in January 2026. Data centers do not respect party lines — the buildout pressure shows up in both columns.
Ranked by in-flight load (under construction + permitted + announced + proposed). Click any state for the per-grid view — rates, generation mix, and the supply-vs-demand chart.
| State | Projects | In-flight | Operational | Canceled / denied |
|---|---|---|---|---|
| TexasTX | 991 | 60.4 GW | 6.9 GW | 380 MW |
| PennsylvaniaPA | 113 |
Three Tufte-style exhibits from EIA Electric Power Monthly. The national rate trend, the country's generation mix, and a small-multiples panel comparing the rate trajectories of the ten states with the most data-center load on file.
Sorted by megawatt capacity, regardless of status. Withdrawn and canceled projects are included to show the historical high-water mark of what got proposed.
- 1Project Matador Fermi America (11 GW Nuclear+Gas)11.0 GWAmarillo · Carson · TX · Fermi America · Under construction
- 2New Era Energy Lea County AI Data Center7.0 GWHobbs · Lea · NM · New Era Energy & Digital · Announced
- 3Google Texas Expansion (Armstrong/Haskell/Ellis)6.2 GWMidlothian · Ellis · TX · Google · Under construction
- 4
Aggregated across every project on file. Developer names are normalized but not perfectly de-duplicated — partnerships and shell entities still show up separately in some cases.
Filter by status, capacity, water demand. Click any pin for the full file.
Denied, canceled, withdrawn, frozen by moratorium — on a single timeline.
Super PACs, corporate PACs, state-by-state ledger of who's spending.
The 30-day click leaderboard — which projects readers are tracking right now.