EIA RATE DATA AS OF 2026-02
FOLLOW THE MONEY IN
Maine
3 data-center projects on file — 0.0 GW of nameplate capacity. Federal data on what residents are paying for the grid to serve them, sourced from the EIA Electric Power Monthly.
Avg residential bill
$204
/ month
Per household · 2026-02
Sales to industrial
19.2%
of state kWh
Factories + data centers · 2026-02
Residential rate rank
#3
of 51
Among the most expensive in the country
10yr rate climb
+108%
#1 of 51
Climbed 2.4× the national pace since 2016
Largest power plant
827 MW
· oil
William F Wyman Hybrid · Cumberland County
§ 01
What residents pay
EIA · Electric Power Monthly
Maine · residential · latest
32.17¢/kWh
↑ +22.6% YoY
As of Single month · 2026-02
Maine · residential · 2026 YTD avg
31.47¢/kWh
↑ +20.1% YoY
vs 2025 YTD
US national · residential · 2026 YTD avg
17.54¢/kWh
↑ +8.5% YoY
vs 2025 YTD
§ 02
How the grid runs
Net generation · 2026-02
Where Maine's electricity actually comes from. Each fuel source as a share of total state generation in the most recent reported month.
MAINE · GENERATION MIX · 2026-02
1.30 TWh net · all sectors
§ 03
Supply vs demand
EIA-860M generator inventory · projects pipeline
535 MW of new generation came online in Maine over the last 18 months; another 346 MW is in the EIA-860M pipeline (under construction or filed). Meanwhile 10 MW of data-center load is in construction or permitted in the state. Largest plant in the supply pipeline: Freedom Pine Solar (York County) — 250 MW of solar, first online 2029-01.
Two bars, one scale. Demand is sorted by certainty — under construction first, then permitted, then proposed. The dashed rule marks where the supply pipeline runs out; everything to the right of it is demand on file with no supply filed against it.
§ 04
Data-center load
3 projects
Projects on file
3
published (excludes draft / archived)
Nameplate MW
0.04 GW
≈ 0 GWh/yr at 50% load
Announced investment
—
aggregate disclosed capex
§ 07
Follow the money in Maine
Know when a new data center deal gets cut, who profits, and who signed off on it.
Follow the money in ME
Know when a new data center deal gets cut, who profits, and who signed off on it.