Iowa
6 data-center projects on file — 2.4 GW of nameplate capacity, $4.9B in announced investment. Federal data on what residents are paying for the grid to serve them, sourced from the EIA Electric Power Monthly.
Avg residential bill
$111
/ month
Per household · 2026-02
Sales to industrial
50.2%
of state kWh
Factories + data centers · 2026-02
Residential rate rank
#46
of 51
Among the cheapest in the country
10yr rate climb
+21%
#49 of 51
Climbed slower than the US since 2016
Largest power plant
1.51 GW
· coal
Walter Scott Jr Energy Center · Pottawattamie County
§ 01
What residents pay
EIA · Electric Power Monthly
Iowa · residential · latest
12.74¢/kWh
↑ +4.9% YoY
As of Single month · 2026-02
Iowa · residential · 2026 YTD avg
12.79¢/kWh
↑ +6.0% YoY
vs 2025 YTD
US national · residential · 2026 YTD avg
17.54¢/kWh
↑ +8.5% YoY
vs 2025 YTD
§ 02
How the grid runs
Net generation · 2026-02
Where Iowa's electricity actually comes from. Each fuel source as a share of total state generation in the most recent reported month.
IOWA · GENERATION MIX · 2026-02
6.38 TWh net · all sectors
§ 03
Supply vs demand
EIA-860M generator inventory · projects pipeline
Iowa is staring at an 1.4 GW energy shortfall: 2.4 GW of data-center load is under construction or permitted in the state, but utilities have only 1.0 GW of new generation in the EIA-860M pipeline to serve it. The largest plant in the supply pipeline is Silver Queen Wind Farm in Crawford County — 252 MW of wind, first online 2028-10. On the way out: Old Gold Energy Center, LLC — 80 MW of wind, retiring 2027-09.
Two bars, one scale. Demand is sorted by certainty — under construction first, then permitted, then proposed. The dashed rule marks where the supply pipeline runs out; everything to the right of it is demand on file with no supply filed against it.
§ 04
Data-center load
6 projects
Projects on file
6
published (excludes draft / archived)
Nameplate MW
2.40 GW
≈ 11 GWh/yr at 50% load
Announced investment
$4.9B
aggregate disclosed capex
§ 07
Follow the money in Iowa
Know when a new data center deal gets cut, who profits, and who signed off on it.